Kemble-Swindon Track Closure

Ahead of the closure of the Kemble-Swindon rail line Geoffrey Clifton-Brown, Member of Parliament for the Cotswolds has said: “I was naturally delighted when the Chancellor announced the £45 Million investment into the Kemble to Swindon rail line redoubling works, which followed a ten year campaign by me to achieve this.

“Obviously this work meant that at some point Network Rail would have to close the line to allow the crucial and necessary work to realign the current track and lay another one, to take place. This closure is all part of the planned operation which was decided last year.

“I attended the opening of the new garden at Kemble Station on the 25th July, with HRH The Prince of Wales, which was a fantastic occasion. At this event I spoke with both Network Rail and First Great Western who assured me that the works are still on schedule for the Kemble-Swindon track to reopen in time for Easter next year.”

Public Meeting

Verbatim Minutes of the Stow-on-the-Wold Public Meeting to discuss the provision of a new GP surgery – 30 June 2017.

CLICK HERE TO DOWNLOAD (PDF: 107k)

Surgery Dates

Call 020 7219 5043 or email cliftonbrowng@parliament.uk to discuss the matter you wish to raise and the possibility of a surgery appointment. Appointments are 10 minutes long. A concise synopsis submitted in writing beforehand will ensure a productive use of time.

Next surgery:

7 October 10-11am
Cirencester.

Latest Newsletter

I was pleased to visit the Abbey 900 in Cirencester Abbey grounds after my surgery on Saturday and to chat to some of the participants and audience on a glorious summer’s morning.

10th July 2017

View The Cotswolds in a larger map